In the Critical Path Method (CPM), the critical path is the longest sequence of activities in a project that determines the minimum time required to complete the project. The critical path represents the activities that, if delayed, would directly impact the project’s overall duration.

To calculate the critical path, you need to perform a forward and backward pass analysis of the project’s network diagram or activity sequencing. The forward pass determines the earliest start and finish times for each activity, while the backward pass determines the latest start and finish times. By comparing the early and late times, you can identify the critical path.

When there are multiple paths with the same longest duration, all of those paths are considered part of the critical path. Therefore, if you encounter multiple paths with the same length during the calculation, all of them should be included in the critical path.

In summary, when calculating the critical path using the CPM, all paths that have the same longest duration are considered part of the critical path.